This is the current design of the railroad. The car floats for the Lehigh Valley are going to be attached by a drawer type system that will be removed when the layout is not operational. Also note the additional arrival tracks in 30th Street Yard. At this point 1/19/09 the Lehigh Valley is under construction and 90% of the High Line track work is completed.

 

Current Layout 01-15-09