The layout of the basment before construction started.

Pre Construction FLoor Plan Removed 07/27/07 Mechanical Room Bathroom Laundry Stairs Electrical Breaker Box Slop Sink Window Window Window Window Window Window Main House Suppor Beam (Two loly Colums)

As of 07/27/07 the first section of the wall was removed.

 

Page Last Updated: July 31, 2007

Webmaster: David Ramos